Skip to content
The Care Home Check

Westerlands Care Village

Elloughton Road, Elloughton, Nr Brough, HU15 1AP

Residential, dementia · 62 registered beds Prime Life Limited

CQC overall rating

Good
Inspected 12 June 2023 · 3 years ago

01 / At a glance

The things that matter first.

A 62-bed residential care home in Elloughton, Nr Brough, run by Prime Life Limited since January 2011. It’s registered to care for adults over and under 65, including people with dementia, physical disabilities and sensory impairments.

Latest CQC rating GoodInspected 12 June 2023 · 3 years agoUp from Requires improvement (November 2021)
Registered manager In post since about February 20252 registered managers since October 2023. No registered manager for 2 months (December 2024 to January 2025).
Food hygiene Very goodKitchen inspected 29 May 2026
The owner’s homes 49 of 59Rated Good or better

What to know

Our reading of the public records · How we decide
  • Nothing we’d highlight
    No breach at the last inspection, no fall in rating, a registered manager in post and the same owner since 2011.
Manager and owner
  • Registered manager in post since about February 2025
    2 registered managers since October 2023. No registered manager for 2 months (December 2024 to January 2025).
  • Run by Prime Life Limited since January 2011
    It runs 59 homes, 49 rated Good or better. Company active, no insolvency cases.

The five key questions

  • Good Safe, Effective, Caring, Responsive and Well-led

Care provided

  • Residential care
  • Adults over 65
  • Adults under 65
  • Dementia
  • Physical disabilities
  • Sensory impairments
  • 62 registered beds

02 / The inspection

What CQC found.

Inspected 12 June 2023 · report published 1 July 2023

“The quality and the safety of the service has improved. Risks to people's safety and wellbeing were managed by skilled and knowledgeable staff. …”
From CQC’s summary of the June 2023 inspection, in CQC’s words.Read the rest of CQC’s summary ↓
CQC’s full summaryWhat CQC found, 5 paragraphs in CQC’s words

The quality and the safety of the service has improved. Risks to people's safety and wellbeing were managed by skilled and knowledgeable staff. People received their medicines safely and as prescribed. The safety of the building and equipment had been maintained and a programme of redecoration was underway.

Staff were recruited safely and there were enough staff to meet people's needs. Staff understood different types of abuse and internal and external reporting processes. Safeguarding concerns had been appropriately referred and action taken by the provider when required.

People received a varied diet and their preferences were catered for and specialised diets were provided to those who needed them. Most people received appropriate support at mealtimes, though sometimes opportunities to engage people were missed and the management team advised they would address this. Induction, training and supervision ensured staff had the required skills and knowledge for their roles. Staff worked closely with relevant professionals to ensure people received appropriate care when they needed it. People were supported to have maximum choice and control of their lives and staff supported them in the least restrictive way possible and in their best interests; the policies and systems in the service supported this practice.

Quality assurance systems were in place and effectively operated which had a positive impact on the service people received. Systems were in place which enabled people, their relatives and staff to provide feedback on the service and suggestions for improvements. Information from feedback was used to further develop the service.

The management team were open and honest if things went wrong, though written apologies were not always sent.

Why CQC inspectedIn CQC’s words

We carried out an unannounced focused inspection of this service on 9 November 2021. Breaches of legal requirements were found. The provider completed an action plan after the last inspection to show what they would do and by when to improve safe care and treatment, person-centred care and good governance. We undertook this focused inspection to check they had followed their action plan and to confirm they now met legal requirements. This report only covers our findings in relation to the Key Questions Safe, Effective and Well-led which contain those requirements.

For those key questions not inspected, we used the ratings awarded at the last inspection to calculate the overall rating. The overall rating for the service has changed from requires improvement to good. This is based on the findings at this inspection.

We looked at infection prevention and control measures under the Safe key question.

About the serviceAs CQC described it in June 2023

Westerlands Care Village is a residential care home comprising of 2 different buildings, Elloughton House and Brough Lodge. Brough Lodge is also split into 3 separate units, each with their own communal areas. The service provides personal and nursing care to people aged 65 and above, people living with dementia and those with a physical disability. The service can support up to 62 people. At the time of inspection 45 people were using the service.

Read the full report on CQC’s website (opens in a new tab)

The home’s history

  1. June 2023
    Good Inspected 12 June 2023, report published 1 July 2023
  2. November 2021
    Requires improvement Inspected 9 November 2021, report published 7 January 2022. Safe, Effective and Well-led rated Requires improvement.
  3. November 2020
    Good Inspected 23 November 2020, report published 23 December 2020
  4. January 2018
    Good Inspected 9 January 2018, report published 8 February 2018
  5. January 2017
    Requires improvement Inspected 25 January 2017, report published 8 March 2017. Safe, Effective, Caring, Responsive and Well-led rated Requires improvement.
  6. August 2016
    Inadequate Inspected 16 August 2016, report published 4 October 2016. Safe, Effective and Well-led rated Inadequate. Caring and Responsive rated Requires improvement.
  7. March 2016
    Inadequate Inspected 21 March 2016, report published 4 June 2016. Safe, Effective and Well-led rated Inadequate. Caring and Responsive rated Requires improvement.
  8. December 2015
    Requires improvement Inspected 10 December 2015, report published 1 March 2016. Safe, Effective, Caring, Responsive and Well-led rated Requires improvement.
  9. April 2015
    Requires improvement Inspected 7 April 2015, report published 14 August 2015. Safe, Effective, Caring and Well-led rated Requires improvement.

Other inspections

5Food hygiene: Very good
Kitchen inspected 29 May 2026 · Food Standards Agency (opens in a new tab), rated 0 to 5

03 / Behind the home

Who runs Westerlands Care Village?

Prime Life Limited
Registered provider since January 2011
Active company

Run by Prime Life Limited since January 2011, which runs 59 homes, 49 of them rated Good or better.

Homes run by the same owner
59
Rated Good or better
49 of 59
Company status
Active
No insolvency cases on record.
Registered manager
In post since about February 2025
2 registered managers since October 2023. No registered manager for 2 months (December 2024 to January 2025).
Owner history
The same owner since 2011
No change of owner on CQC’s records.
Company accounts and filingsOwnership chain and latest accounts, from Companies House

Ownership chain, top company first

  1. DMWSL 532 Limited · top company
  2. Prime Life Limited · runs this home

Latest accounts at Companies House

Prime Life Limited (opens in a new tab)
Year to
31 March 2026
Net assets
See the filing (opens in a new tab)
Filed
12 October 2026
Next due
31 December 2027
DMWSL 532 Limited (opens in a new tab) (parent)
Year to
31 March 2026
Net assets
See the filing (opens in a new tab)
Filed
9 October 2026
Next due
31 December 2027

Accounts filed as scanned PDFs link to the filing. Facts only, each dated and linked. We don’t score financial risk.

04 / Planning a visit

Fees, funding and getting there.

Fees: we don’t have Westerlands Care Village’s fees. Ask the home for a written fee schedule, including what’s extra.

Local costs, for comparison

These are not Westerlands Care Village’s prices.

What the council pays
£1,040 a week
East Riding of Yorkshire paid care homes this on average for a residential place for someone 65 or over (2024–25). If you pay for yourself, homes usually charge more.
Will the council help pay?

In England from April 2026: with over £23,250 in savings and assets you usually pay in full; under £14,250 the council funds your care, with a contribution from your income.

Help with paying for care

Address

Elloughton Road, Elloughton, Nr Brough, HU15 1AP

Energy rating (EPC): B · January 2012 (expired) · View certificate (opens in a new tab)

Getting there

  • Nearest railway stationBrough Rail Stn, 0.7 miles
  • Bus stops within 5 minutes’ walk4, nearest 2 minutes away

Health care nearby

The nearest surgery isn’t always the one residents use. Ask the home which GP practice looks after them.

Everything on this page comes from public records, such as CQC, Companies House and the Food Standards Agency. We don’t endorse any home. If something’s wrong, the organisation that holds the record can correct it, and we’ll pick up the change. How we check

Spotted something wrong?Let us know what’s incorrect and we’ll look into it. If the information comes from a public record, we’ll point you towards the organisation responsible for updating it.If you have concerns about the care someone is receiving, contact your local council or CQC. If someone is in immediate danger, call 999. Tell us

This isn't for concerns about someone's care. If someone is in danger, call 999. Otherwise contact the council's adult social care team, or tell CQC through Give feedback on care (opens in a new tab).

Please don't include names or health details of residents or staff.

Help families get a better picture

Do you run Westerlands Care Village? Share details that CQC’s records don’t cover, such as your fees, rooms, visiting arrangements and activities.

Claim this page